Hot AI News

Apple’s foldable iPhone Duo gets titanium from a Pennsylvania mill

Apple adds Perryman Company for iPhone Duo titanium, widens Qnity's camera role on iPhone 18 Pro, and lists the US suppliers behind nearly 100 components.

Apple’s foldable iPhone Duo gets titanium from a Pennsylvania mill
Image: Apple

Apple said on October 20 that it will commit up to $100 million over three years to Perryman Company, a Pennsylvania titanium producer, for metal used in the foldable iPhone Duo. It also expanded its work with Qnity Electronics on the iPhone 18 Pro camera, according to the official announcement.

Titanium, camera films and a long supplier list

Both deals sit under the American Manufacturing Program (AMP), part of Apple’s four-year, $600 billion U.S. pledge. At its site in Houston, Pennsylvania, Perryman melts, forges and rolls titanium containing at least 80 percent recycled material for iPhone Duo, Apple says. The company describes the phone’s grade 5 titanium enclosure as very strong and calls the device the first foldable iPhone.

A pile of thousands of titanium rods at Perryman Company's facility
Image: Apple

Qnity Electronics, based in Delaware, joined AMP in March. It will make advanced films for the variable aperture system in the iPhone 18 Pro, which Apple ties to the new 48MP Fusion Main camera. Apple says on-device intelligence adjusts the aperture automatically, letting in more light in dim scenes and sharpening detail in bright ones.

Apple also says nearly 100 components in the two phones come from American companies in more than a dozen states. It named several of them:

A Perryman Company worker inspects spools of titanium
Image: Apple
  • Broadcom: radio frequency parts from Fort Collins, Colorado, under a $1.5 billion investment announced in July, with a multiyear deal for more than 15 billion chips.
  • Corning: specialty glass, including Ceramic Shield, from Harrodsburg, Kentucky. Apple says all iPhone and Apple Watch cover glass sold worldwide will come from there by the end of 2026.
  • Coherent: laser components from Sherman, Texas, used for Face ID and the redesigned Dynamic Island on the iPhone 18 Pro and Pro Max.
  • TSMC: its Arizona fab will produce more than 100 million chips for Apple in 2026.
  • Amkor: a packaging and test plant in Peoria, Arizona, with Apple among its first customers and a projected 3,500 local hires across phases 1 and 2.

Apple also opened an Advanced Manufacturing Center in Houston, Texas, in August. The 20,000-square-foot site trains small and medium-sized businesses and sits in the facility that builds Apple’s AI servers. The same facility will start making the Mac mini this year. Those servers are the hardware behind Private Cloud Compute, Apple’s cloud AI system.

COO Sabih Khan said the company is “proud to work with Perryman and Qnity Electronics to continue expanding our American Manufacturing Program and support U.S. jobs.”

Advertisements

What the phone buyer actually gets

For buyers nothing changes in the product. The Duo is not assembled in the U.S., and Apple does not say where the iPhones are put together. MacRumors reports that the Duo starts at $1,999 for 256GB, rising to $3,199 for 2TB. Pre-orders opened on October 16 and it ships on October 23 in the U.S. and more than 70 other countries and regions, with 28 more following on October 30.

The announcement therefore concerns where parts come from, not where the phone is made. A component made in Pennsylvania or Arizona may still travel overseas for assembly, and the release does not describe that route.

The figures to check as the program grows

The program began on August 6, 2025, alongside the move from a $500 billion to a $600 billion pledge, according to DatacenterDynamics. The launch group had ten companies, including Corning, Broadcom, Coherent, TSMC and Amkor, so today’s news adds two names and deepens ties with several existing ones. Press coverage at the time linked the plan to the threat of chip tariffs. Apple also pledged to hire 20,000 people in the U.S., mostly in R&D, silicon engineering, software and AI and machine learning.

Against that backdrop, the $100 million for Perryman is small next to the $600 billion headline. It is also stated as an upper limit, “up to”, over three years, so the actual spend depends on what Apple orders. The release gives no volumes, no job count for Perryman or Qnity, and no contract values for Qnity.

Three things would show whether the program is producing real output:

  • Whether Corning’s Kentucky plant delivers all the cover glass Apple projects by year end.
  • Whether TSMC’s Arizona output exceeds the 100 million Apple chips cited for 2026.
  • Whether Amkor’s Peoria plant reaches its hiring target, since packaging is a step many U.S.-fabbed chips still leave the country for.

Every figure here comes from Apple or its partners and none has been independently verified. Apple also does not say how much of each component’s value is added in the U.S., and the 80 percent recycled titanium and the renewable energy requirements for suppliers are likewise Apple’s own claims.

Sign Up for the Daily AI Pulse

One email a day. All the stories that matter.

Alex CarterAI News & Big Tech Correspondent

Alex Carter writes for Aiholics, keeping readers updated on the fast-paced world of AI and Big Tech.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may also like